EPermit Project
The City is streamlining citizen services to manage and process electronic building and development permit applications.
The City is streamlining citizen services to manage and process electronic building and development permit applications.
Rehabilitation of the Overlanders Bridge and adjacent multi-use pathway will occur in 2025.
Work on the Tranquille Road Sanitary Main and Road Enhancement Project | Phase 3 (Crestline to Southill) is scheduled to begin in early June 2025.
Construction of the Riverside Park outdoor skating facility will begin in spring 2025.
Updating Kamloops' Official Community Plan.
The purpose of a building bylaw is to ensure the administration of required building codes and to regulate construction within a community.
Build Kamloops is a visionary program to re-establish Kamloops as Canada's Tournament Capital.
FireSmart is living with and managing for wildfire in your area and on your property.
Installation of a sewer main along Lansdowne Street is set for spring 2024 and will include significant impacts to commuters within the downtown core.
Beautification, roadwork, and infrastructure upgrades are being constructed along Tranquille Road near Crestline Street.
A proposed multi-use pathway is being considered along Lansdowne Street.
We will be installing a new reservoir and booster station within Greenstone Park.
Rehabilitation of the advanced erosion in Lower Springhill Creek within the Sahali Terrace Nature Park will take place in late 2024 and into Spring 2025.
Construction of a multi-use pathway (phase two) in Pioneer Park will resume in March 2025.
We want to hear from you on how you want to hear from us!
Provide input into the Active Transportation section of the Transportation Master Plan.
The City is expanding the westbound Highway 1 off-ramp at Pacific Way (Exit 367) by adding a second westbound left-turn lane.
We conduct a comprehensive Citizen Satisfaction Survey every two years to provide a detailed assessment of citizens’ attitudes, needs, priorities and satisfaction levels.
The Kamloops transit system is seeking feedback from the public regarding transit fares.
Learn about key budget timelines and processes, view documents, infographics and videos, and ask questions.
A multi-phase project encompassing an extension to Copperhead Drive in Pineview.
The Kamloops Centre for the Arts is part of the Build Kamloops vision.
Sewer Main Upgrades and the construction of a multi-use pathway will commence in the area of Sifton Lane and Highway 5A.
The current RCMP detachment has surpassed functional and spatial needs and will become more constrained as the City and policing staffing needs continue to grow.
The Parks Plan provides a framework for decisions related to parkland, park development, outdoor recreation, and park management to ensure that goals are being achieved.
Hey Kids–Get your creativity flowing and name the snowplow!
Community safety requires a coordinated multi-agency and community approach.
In Kamloops, there is strong desire and momentum to increase the housing supply.
A Community Wildfire Resiliency Plan is a comprehensive approach toward wildfire, including risk reduction and resiliency measures.
The City is updating its Housing Needs Report. A housing needs report addresses and identifies gaps, barriers, and future housing needs across the housing spectrum.
Learn about transportation network changes and two future parks in the East Kamloops corridor, in conjunction with the Pineridge development rezoning application.
The City is developing an East Kamloops Master Watershed Plan and we want to hear from residents in the area.
Find out when Council will be in your neighourhood to listen to your opinions and concerns.
A multi-rink ice complex has been identified as one of the Build Kamloops projects.
Learn about key budget timelines and processes, view documents, infographics and videos, and ask questions.
What does the future of culture in Kamloops look like?
The City of Kamloops has now completed the 2023 Accessibility Plan, which is available for review.
The City is making changes to its Official Community Plan and the Zoning Bylaw to comply with provincial housing legislation and to increase local housing supply.
Establishing a benchmark level of service that is a balance of what is acceptable, appropriate, and affordable in meeting industry standards and community needs.
Data is being compiled following a survey on proposed traffic flow improvements at 1st Avenue and Lansdowne Street.
The Community Climate Action Plan serves to guide, motivate, and inspire our community to reduce fossil fuel use and transition to a low-carbon future.
Learn about current, upcoming and completed projects around the city.
The Vision Zero Strategy and Action Plan is a practical and action-oriented approach to reduce transportation fatalities and serious injuries.
Have questions or want to learn more about a project, contact us below:
Website | www.kamloops.ca |
---|---|
In writing | City of Kamloops, 7 Victoria Street West, Kamloops BC, V2C 1A2 |
The City of Kamloops acknowledges that we are located on Tk̓emlúps te Secwépemc territory, situated within the unceded ancestral lands of the Secwépemc Nation.
We honour and respect the people, the territory, and the land that houses our community.