News

Update for August 24

24 August 2023

This week, removal of waste material from the roadway and boulevard was completed. Crews are now excavating in advance of starting utility work (sewer and water) in the area.

During the excavation and utility work, nearby residents can expect increased vibration and noise from the heavy equipment. Any fragile items should be packaged or protected from possible damage.

Residents are advised that there are open trenches within the construction zone and are asked to respect the fencing and signage that is in place.