Todd Road Sidewalk Project (Supplemental 24.3)

The Barnhartvale Community is requesting the installation of a sidewalk on the north side of Todd Road between Barnhartvale Road and Ronde Lane as part of the upcoming Todd Road Reconstruction Project, planned to be completed in 2024 and 2025. To include a sidewalk in the project would require an additional $1,700,000 for engineering design and construction. This cost includes the concrete sidewalk, driveway crossings, concrete curb and gutter, catch basins, and drainage tie-ins. If funding is approved, the entire reconstruction project would be delayed and would not begin until 2025.

COST: $1,700,000 in 2025

This proposal would be funded through long-term debt.